The testbeam requests for 2010 have been sent to the SPS coordinator. All ATLAS related requests (IBL, PPS, 3D and diamond (dPix)) have been entered in our Google calendar, which you can view below.
For more information look at the DESY testbeam page.
Please send an email to Jens to have your favorite samples added to this list.
*EUDET testbeam in november *Analysis of november 2009 data
For these measurements the aim would be to record data from one or
more runs per parameter, each of them with about 100k - 300k tracks.
I don't have a clear idea as to how long one run with 100k tracks will
take. For the time being I calculate something like one week real time
for a measurement of whatever quantity you are interested in, taking
data at different angles of the DUT with respect to the beam, multiple
100k track runs per incidence angle.
Based on discussions with Beniamino Di Girolamo I expect we can put 2 or 3 DUT in the beam, more or less at any given time. This puts the number of DUTs we can measure this year at 15 - 20.
To run a DUT in the CERN testbeam we need to provide at least one TPCC/TPLL setup including VME crate and power-supplies for each DUT (no longer necessary if a MCC board is used). NO setups are available at CERN.
In order to be compatible with the EUDET the TPLL has to modified. That involves soldering in an additional connector and upgrading the firmware. This is a list of TPLLs that were already modified:
TPLL serial number | TPLL Board Version | VHDL version number old | VHDL version number after modification | Home Institute/Owner | contact person | comment (e.g. already used with testbeam setup/when?/history) | Dortmund Tracking Number (Barcode/shortened) | data |
---|---|---|---|---|---|---|---|---|
16 | V4.0 Rev. A00 | unknown | 32 | Dortmund | Daniel Münstermann | 94d7326b | ||
81 | V4.0 Rev. B00 | 20 | 32 | Munich | Michael Beimforde | 14-05-2010 Modified and tested in Dortmund, stopped working after first test 27-05-2010 TPLL is successfully repaired, the wrong initialisation modus was set due to a faulty connection, a bypass wire was added between the middle pin of JP2 and the AB2(M0) pin of the FPGA, tested again with digital scans and threshold scan, everything looks fine besides the 16BIT SCAN 1-06-2010 sent to Munich together with TPCC ser.#14 and newly installed TurboDAQ PC | 9588c29c | TPLL_SERIAL_81_POST_MODIFICATION_TEST_10_5A.zip TPLL_81_photos.zip |
6 | V4.0 Rev. A00 | 15 | 32 | Bonn/CERN? | Alessandro La Rosa? | 28-05-2010 Modified and tested with digital scans and threshold scan in Dortmund, a few errors during FIFO test, but everything else looks fine | f1ce7d22 | TPLL_SERIAL_6_POST_MODIFICATION_TEST_10_5A.zip |
76 | V4.0 Rev. B00 | 20 | 32 | Bonn/CERN? | Alessandro La Rosa? | 28-05-2010 Modified and tested with digital scans and threshold scan in Dortmund, everything looks okay besides the FIFO Scan | 38613fee | TPLL_SERIAL_76_POST_MODIFICATION_TEST_10_5A.zip |
77 | V4.0 Rev. B00 | unknown | 32 | Dortmund | Daniel Münstermann | Modified in 2009, used in DESY testbeam in May 2010; 28-05-2010 tested with digital scans and threshold scan, everything works --> reference | 857d5565 | TPLL_SERIAL_77_POST_MODIFICATION_TEST_10_5A.zip |
Although it is not necessary to modify the TPCC probably it should be encouraged also to keep track of those that are known to work with the testbeam setup/available:
TPCC serial number | VHDL version number | channel # known to be in working condition | Home Institute/Owner | contact person | comment (e.g. already used with testbeam setup/when?) |
---|---|---|---|---|---|
39 | 31 | 2 | TU Dortmund | ||
14 | channel #0 broken | Munich |
MCC-Board serial number | VHDL version number | channel # known to be in working condition | Home Institute/Owner | contact person | comment (e.g. already used with testbeam setup/when?) |
---|---|---|---|---|---|
TU Dortmund |
The beam telescope including power supplies, trigger electronics and NIM electronics needed for trigger and synchronisation is provided by the Pernegger group.
The cold box that was used for pixel testbeams in earlier years has been refurbished by technicians in genova and has been used for the 3D testbeam in march. It is currently being transported to the H6A area to be used for diamond and other testbeams.
In order to use the available beam time as effectively as possible a number of preparations are needed.
Here I will collect information on testbeam telescopes like performance, DAQ software and interfaces, availability, etc.
The sequence in which the telescope systems appear on this page only represents the sequence in which I learn about them...
The BAT is used in the testbeam measurements that we could piggy-back on.
It is easily integrated with a TPLL/TPCC ATLAS readout system, TurboDAQ
based DAQ software already integrated with the telescope DAQ. This
makes it more or less a plug-and-play solution for ATLAS Pixel
compatible devices.
The BAT currently has only three telescope plains functional, an additional one has been sent to Ohio for repairs. With three reference plains the accuracy for the prediction where a track hits the DUT is limited to about 13um.
More information on the BAT can be found in this paper.
Information on the telescope can be found here.
The EUDET telescope comprises 6 layers of monolithic MIMOSA sensors. It reaches a spatial resolution around 3 um.
The
telescope can be rented from EUDET and comes with mechanics for the
telescope itself as well as for the DUT (including translation and
rotation stages), trigger logic and a DAQ PC. The DAQ system is C++
based and it should be rather easy to integrate a DUT DAQ system.
Comment from Ingrid: The DAQ from the telescope and the DUT can be integrated on a very low level just via the trigger logic unit. Then data is merged offline. For this the ATLAS DAQ just has to comply to the trigger handshake (i.e. accepting a veto). The EUDET group will then provide files with the track information. It would be recommendable to read the event number to make sure that the synchronisation is ok. The EUDET Telescope will be available at SPS H6B from mid June till probably November. It is already booked from mid July to the end of September. Parasitic use of the EUDET telescope in parallel to other ATLAS activities is possible.
An effort to integrate the TurboDAQ system with the EUDET DAQ on the level described by Ingrid has started in Dortmund.
At the moment I am evaluating the possibility to use the EUDET telescope for testbeams in 2010.
Responsible: JensWeingarten
Last reviewed by: Never reviewed
I | Attachment | Action | Size | Date | Who | Comment |
---|---|---|---|---|---|---|
![]() |
ATLAS_Beam_Telescope-NIM_2002.pdf | manage | 802.8 K | 25-Mar-2009 - 14:44 | JensWeingarten | NIM paper about the BAT |
![]() |
AUW_February_Testbeam.ppt | manage | 1359.5 K | 27-Feb-2009 - 13:46 | JensWeingarten | Jens' presentation at the ATLAS Upgrade week, february 2009 |
![]() |
Atlas-TestBeam-Calendar.pdf | manage | 101.2 K | 08-May-2009 - 15:05 | JensWeingarten | Calendar view of ATLAS Testbeam Periods |
![]() |
Atlas-TestBeam-Periods.pdf | manage | 23.1 K | 08-May-2009 - 15:04 | JensWeingarten | ATLAS Testbeam Periods |
![]() |
EUDET_Teleskop-CERN_Aufbau2.pdf | manage | 2506.2 K | 27-Feb-2009 - 13:43 | JensWeingarten | Drawing of the EUDET telescope setup |
![]() |
Minutes_08-12-2009.pdf | manage | 35.2 K | 04-Jan-2010 - 10:03 | JensWeingarten | |
![]() |
Minutes_29-10-2009.pdf | manage | 46.5 K | 01-Oct-2009 - 15:30 | JensWeingarten | Minutes TB meeting 29-10-2009 |
![]() |
PPS_Testbeam_08-09-09.pdf | manage | 804.6 K | 08-Sep-2009 - 15:37 | JensWeingarten | |
![]() |
PPS_Testbeam_meeting_08-09-09.ppt | manage | 3114.5 K | 08-Sep-2009 - 15:17 | JensWeingarten | Jens' slides for the preparation meeting 08/09/2009 |
![]() |
TPLL_SERIAL_76_POST_MODIFICATION_TEST_10_5A.zip | manage | 3488.5 K | 29-May-2010 - 13:31 | AndreRummler | TPLL_SERIAL_76_POST_MODIFICATION_TEST_10_5A |
![]() |
TPLL_SERIAL_76_POST_MODIFICATION_TEST_DIGITAL_10_5A.zip | manage | 1909.0 K | 28-May-2010 - 21:20 | AndreRummler | TPLL_SERIAL_76_POST_MODIFICATION_TEST_DIGITAL_10_5A |
![]() |
julief-ieee2008.pdf | manage | 59.1 K | 27-Feb-2009 - 13:43 | JensWeingarten | Paper on DEPFET integration into EUDET telescope |