June 97 beamtest at KEK (T416) T416: Beam test of n-stip isolation structures in the n-bulk n-strip silicon strip detector (II) Spokesperson: Y. UNNO (KEK) Machine time (Accelerator): June 04 (Wed) 17:00 - June 20 (Fri) 1:00 EP2/EP1/IT (45 shifts) June 16 (Mon) 9:00 - 10:30 emittance meas. June 20 (Fri) 1:00 - June 21 (Sat) 1:00 EP2(A/B) (3 shifts) June 21 (Sat) 1:00 - June 22 (Sun) 1:00 EP2(A/C) (3 shifts) Beamtime (for KEKB(Aerogell)/T416): June 16 (Mon) 9:00 - 10:00 Clearing-up the beamline (previous runner) 10:00 - 12:00 Setup of KEKB and T416 June 22 (Sun) 1:00 Beam end Note: Because of the electrical power shortage, IT(testbeam) has the lowest priority and will be shut in the day time when required. Man power and schedule: Engineering - T. Kohriki Shift - Y. Unno, S. Terada (KEK) R. Takashima (Kyoto Edu.) H. Kitabayashi, K. Sato, M.Ikeda (Hiroshima) T. Umeda, E. Kitayama (Okayama) G. Moorhead, B. Dick (Melbourne) Part time - H. Spieler (LBNL) I. Nakano (Okayama) G. Taylor (Melbourne) 11 12 13 14 15 16 17 18 19 20 21 22 23 24 We Th Fr Sa Su Mo Tu We Th Fr Sa Su Mo Tu Beam <----------------> DAQ setup(2F) X Beamline setup X Beamline cleanup X Unno x x x x x x x x x x x x x Terada x x x x x x x x x x x x x Takashima X X X X X X X X Kitabayashi x x x x x x x x x x x x Sato X X X X X X X X X X X Ikeda X X X X X X X X X X X Umeda X X X X X X X X Kitayama X X X X X X X X Moorhead X X X X X X X X X X X X Dick X X X X X X X X X X X X (Geant4 wksp) - - - - - Setup: Si beam telescope - IRAM UCSC-KEK end-tap - DSP UCSC-KEK centre-tap - DSP Si beam telescope - IRAM Mel forward #1 - DSP Mel forward #2 - DSP Si beam telescope - IRAM Run plan: Temperature: room temp. Cooling: air flow (1) Checkout (1.1) Trigger-Si telescope relative position with beam (1.2) 2, 3, 4 fC - Confirming calibration (at 200 V) (2) Run Bias voltage: 80, 100, 120, 140, 160, 200 V Thresholds: 0.8,1.0,1.2,1.4,1.6,1.8,2.0,2.5,3.0 fC (for the bias voltages) Number of events: 50K each, 100K each for 2.5 and 3.0 fC