Jan. 98 proton irradiation at KEK (and subsequent beamtest) Updated: Dec. 16, 1997 Fluence: 3 x 10^14 protons/cm^2 Irradiation time: Jan. 13 - 15?, 98 Installation time: Jan. 9, 98 Extraction time: Feb. 3?(from beamline), Feb. 10? (from radiation section) Samples: n+(n) and p+(n) detectors Size: 64 mm x 63.6 mm x 0.3 mm thick, otherwise mentioned In cold environment: 1st row: (1) Hamamatsu n+(n) baseline 2 (2) Hamamatsu n+(n) new p-stop 2~4 (3) SINTEF polyimide passivated p+(n) (With Ceramic+PA) 2 (4) CIS wedge p+(n) (With Ceramic+PA) 2~4 In warm environment: 2nd row: (5) SiC pad detector (~1 cm x ~ 1 cm x 500 um?) 1 (6) Mechanical grade detectors 4 (7) Mechanical grade detectors 4 Notes: - Samples, (1) to (4), are on the ceramic board with pitch-adaptor(PA), and wire-bonded (detector-PA, and PA-ground) Four samples on ceramic/PA are going into the beamtest being planned immediately after the extraction. Beamtest: Feb. 19? - 28?, 98 Irradiated detectors: (1) Baseline n+(n) (2) New p-stop n+(n) (3) SINTEF p+(n) (4) CIS wedge p+(n) Module: (5) OZ1 forward module Work sharing: Item Quantity Institute Comment Ceramic boards(*1) 15 MPI shipped Pitch adaptor 12 Cambridge Readout hybrids 4 Cambridge Wire-bonding 6 Hamamatsu/KEK (*1) Remaining is to be used for future production of n+(n) and p+(n) detectors in Japan. Pre-irradiation measurements: - IV, CV, interstrip cap at KEK by KEK - Strip noise at KEK by who? Post-irradiation measurements: - IV, CV, interstrip cap at KEK by KEK - Strip noise at KEK by who? Beamtest: - Electronics tuning at KEK by who? - DAQ hardware at KEK from CERN (S.S) - DAQ software at KEK by Melbourne (G.M) - Cooling box at KEK by KEK - Cooling supply at KEK by KEK